Monday, May 19, 2014
Sunday, May 18, 2014
Wrapping Everything Up

Completed! Rewired the trailer light harness this morning. It worked before but it wasn't very organized. Second time around all the wiring is in flexible conduits with the ends sealed with self-fusing tape. I also attached a vehicle-side connector to the jack to plug the trailer-side connector into when not being towed to prevent water getting to the electrodes. Yesterday I put on the towing bar onto the vehicle, which was much more involved than it should have been. It seems that the access holes in the frame of the car are not as big as the towing bar designer thought. It was quick enough to widen it a bit with a saber saw, but fishing the bolts through the hollow frames was nontrivial. The towing bar is SAE Class I (200 lb tongue weight), and didn't flex at all as I jumped on the ball mount, so I'm quite happy with it. The wiring harness for the towing vehicle was a little more straightforward. I routed the connector down through the spare tire compartment and lashed it to the towing bar. Everything fit under the carpet of the trunk so it was all pretty tidy. The only thing left to do that I know of is to get it registered, which we are hoping to complete tomorrow. Although, I'm sure there will be some trouble-shooting along the way as well. Cheerio!
Monday, May 5, 2014
Galley Vent
We are getting very close, just a few odds and ends left. One of those was the vent from the galley to the exterior. It has an interior butterfly vent make of 316 stainless, with an ABS louver vent on the exterior. This means that while the vent is open, rain will not enter through it and that the vent can be closed when underway.
Sunday, April 27, 2014
Battery and Battery Holddown
We've had the battery for some time, but its installation has just been completed. After the tongue box and spare tire added significant weight to the front of the trailer, we decided to move the battery to the galley. This required running a 10ga wire down through the bottom of the trailer and along the frame to the tongue box. I'm still not happy about that, but it should be fine. The battery itself is 55 lbs. and it would be catastrophic if it started bouncing around without restraint. It is held in place by two massive pieces of purpleheart epoxied to the galley floor. The vertical piece above the battery is a cam with a turnbuckle to tighten. It is connected to a structural beam above. The flat plywood is to distribute the load and not crack the battery case. The leads from the battery go to the terminal block on one of the purpleheart cleats. The ground goes straight to the tongue box, while the positive goes through a 30A circuit breaker first.
Tongue Box Painting and Hardware
The tongue box was painted with the same paint as the exterior of the trailer. The interior was given three coats of spar urethane to protect if from contents banging around inside and any UV. The hinge is a 30" brass piano hinge held down by 30 8-32 brass machine screws through bolted to the lid and the box itself. The seal around the edge is neoprene, and the lip of the box overlaps it by about 1" to protect it. The lid is held down by two elastic pull latches. They are at a bit of a strange angle but appear to hold quite well. The lock is on center and catches a piece of aluminum angle iron on the interior of the front of the box. To minimize any water coming through the hinge, it was laid over a strip of waterproof fabric. Lastly, I installed a small strip of aluminum to protect the rather delicate thermistor on the front of the charge controller.
Sunday, April 20, 2014
Tongue Box Waterproofing
The tongue box has been attached! The edges adjacent to the trailer have thickened epoxy fillets to bare the load of the weight of the tongue box and its contents. The outer faces have 2-3 coats of epoxy, depending on the location. The interior has 2 coats of epoxy and several coats of spar urethane. The spare tire is also temporarily mounted on the side to figure out the bolt pattern and length. The tongue box is also proving itself to be pretty strong as well, it essentially hovers over the tongue so this is important if anything heavy is to be put in it. On this subject, the battery has been relocated to the galley to decrease the tongue weight a bit and make the trailer easier to handle. Also visible in the photo is the wires to the solar panel. I would have liked to internalize this but unfortunately this turned out to not be an option due to the size of the conduit. The wiring is marine grade and UV-stabilized so I don't predict any issues with it, it is just a bit of an eye-sore.
Roughing Out Tongue Box
With the warm weather, I've been able to pull out the sheet of plywood for the tongue box and get busy. It was pretty hard to get the whole thing scribed to fit the front of the trailer because of the way the tongue box hangs off of the front and is not supported underneath. In the two pictures you can also see where I'm planning on putting the spare tire, although right now its just resting on some 4x4s. The tongue box has three drains/vent in the floor, one of which is visible in the second photo. The tongue box is also very structural: the plywood is 1/2" ACX, the joints have 1 1/2" cleats and the shape is very resistance to torsion from uneven loading, for example.
Hatch Prop
Door and Window Trim Complete
With the trailer outside, the race is on to get the door and windows sealed up in case of rain or snow. The door took some work to get the hinge side of the trim trimmed back so that it would hit the edge as the door opened, but it worked out in the end. For the door trim I was able to clamp it, but the windows presented more of a challenge. I ended up holding it down with drywall screws until the epoxy cured, then removing the screws and drilling out the hole with a counter sink bit. This allowed me to epoxy in teak bungs and then chisel them off flush. It makes for a very yacht-esque look and I'm very happy with how it turned out. The joint between the trim and the glass also got some silicone sealant to minimize water seeping into the joint. This just leaves the access hatch at the front and then the trailer will be completely weatherproof!
Wheel Upgrade
The original wheels provided with the trailer were pretty dismal and did not include a spare, so it was decided that the wheels would be upgraded to a larger size and better quality. The old wheels had 8" rims, so we went with 12", which gives just over 20" diameter with the tire and increases the ground clearance to about 9". Larger wheels also improve handling and decrease the wear on the hub bearings at highway speeds. The current plan is the mount the spare on the side of the tongue box, although we are planning on rearranging heavy items such as the spare to get the tongue weight ideal.
Moving Out and Solar Panel Installation
We hit a big milestone when we got the trailer moved out of the garage and bolted down to the frame. We lifted it pretty comfortably with four people, so current estimated weight is about 300-400 lbs. It took most of the day to get it aligned, mark bolt holes, lift the trailer off of the frame and moved the frame over, drill the holes, lower the trailer back onto the frame and get it realigned, and finally install the bolts. The trailer is held in place with 7 1/2" by 4" stainless screws, with nylocks and some threadlock just in case. First install in the open air is the solar panel, a 120W Kyocera module. It had been previously installed, but I removed it to keep the trailer as light as possible until it was on the frame. There are four L-aluminum brackets, one for each corner, made by bending rectangular 1/4" stock in a hydraulic brake. The frame of the panel is mounted to each of these with two 10-24 stainless machine screws with nylocks. To mount the brackets to the trailer, I drilled out a hole for each one into a structural member under the plywood. I then epoxied in a fiberglass tube and tapped it for a 1/4" bolt and used it to bolt the bracket on. It turned out very solid; you can shake the trailer by that panel without any worry.
Friday, April 4, 2014
Door Trim Continued
After epoxying the pieces of the door trim together using the door as a guide, I added a 1/8" rabbet around the outline of the door. Given that if you slam the door hard enough it compresses the seal enough to go a bit past the frame, I didn't want the teak to take any of the impact. I also have constructed the trim around the door window. Unlike the trim around the door itself which I can clamp while the epoxy cures, the trim around the windows has to be screwed in to hold it. I used 8 drywall screws, then took them out after the epoxy cured. To cover the holes, I drilled them out with a countersink bit and put some bungs in them. I'm quite happy with the results, although some of the bungs twisted as I pounded them in and aren't perfectly aligned with the grain. I also added a second silicone seal around the window to keep water from pooling in the edges
Windows Arrive and Trim Work
Thursday, April 3, 2014
Beginning Electrical
Now that all the conduit has been sealed inside the ceiling, it's time to make sure everything electrical is functioning. The control panel inside to cabin is the most complex electrical portion, and that is up and running now. It has the cabin light switch with a dimmer, the toggle for the ventilation fan, and a toggled 12V outlet with an analog ammeter to show current drain. Everything inside is shrink-wrapped, so I'm hoping there won't be any issues although it is pretty accessible if anything goes wrong. The other electrical portion I've installed in the fuse block. It is located on the front of the trailer and will be enclosed in the tongue box. It has six fuses and a ground bar , although I'm only using 4 of them; cabin light, galley light, ventilation fan, and the 12V socket in the cabin. The wiring is all 18 gauge, except for the socket which is 10 gauge. I'm thinking of doing a 1A fuse on the lights and fan, and a 15A fuse on the socket. Right now, I'm running everything off of a 12V 7Ah battery that I found until we have the actual battery for the trailer.
Painting and Beginning to Install Hardwear
Standoff Blocks
Due to the design of the frame, there are several bolt heads sticking above the longitudinal members and the lateral members are inset about a quarter of an inch. To compensate, I cut out some purpleheart standoff blocks for the trailer to sit on. There are two full width pieces, on the rear rail and on the second from the front. These each have 4 3/8" stainless machine screws going through them to attach the trailer. The other two rails each have two small blocks with are positioned under the floor beams to help distribute the weight.
Galley Cabinets
Storage in the galley is a little inconvenient due to the shape of the available area. I put a couple of cabinets in, with a sliding door compartment and a little shelf above it. The area is trimmed in cherry and there is a nice thick trim piece for the counter edge to stiffen it and protect the edge grain. To keep the cabinet doors closed, I put in a small S-shaped piece that can rotate and hold them both.
Hatch Skin
The galley skin is 1/4" ACX ply with the grain oriented horizontally. I originally had some doubts as to whether the plywood would conform to the bend or distort the frames enough to affect the seals on the edge. Happily, there were no complications of any sort. The outer face is fiberglassed and the inner face is painted, although I've left the ribs bare for now.
Sunday, March 2, 2014
Glassing Begins
First round of fiberglass on the teardrop. I am doing each side separately, and then glass over the top. I'm using 6 oz. cloth all around, with 4 inch overlap on all the edges and the bottom 2 inches curled under the bottom to protect the edge of the ply. I also rolled over the fiberglass in the doorway as seen in the second picture, as that edge is going to get a decent amount of wear. Both sides are glassed and have gotten an additional coat of epoxy to fill the weave of the cloth.
Galley Hatch Framing
With the ribs cut out of the lamination, they were all clamped into place for the intermediate supports to be installed between them. I liked the idea of having a center rib for mounting things, but that did lead to some asymmetry in the supports due to how they have to be staggered for the clamps.
Galley Hatch Rib Lamination
The curved ribs for the galley hatch have been puzzling me for a long time, but now that I need to start working on them I've decided to bite the bullet and laminate them. I'm alternating cherry and maple for a 5" wide laminate about 50" long, the idea being to rip individual ribs out on the bandsaw. I did the first three laminates and clamped them onto the form, then added three more onto it and reclamped it. I'm pretty happy with how they turned out; there are a few dry spots to fill, but overall it is quite stiff, plus laminates look amazing when finished.
Second/Third Roof Panels
Second roof panel is on, as well as the third which is really just a 14" strip. Each went on without any fuss, although the seam between them required some work. There was no stringer under the joint as in the front due to the wiring for the vent fan and hatch light, so I glued in blocks every 8 inches. Even so, the last section warped considerably after painting. The whole section was planed down and the seam glassed over with a strip of biax. The second photo shows the biax curing with some strips over it to hold it down to match the other section. Moving down each edge behind the panels being installed, I've also been planing them down to a radius of around 3/4" to help the glass roll over without lifting up. The bottom edge has been rounded over as well, as I plan to have the glass from each side curl under the edge to protect the bottom edge grain of the plywood. Overall, I'm pretty happy with how well the ACX took the bending around all the radii.
Tuesday, February 18, 2014
More Table Time
Photo below shows the table in the stowed position. Holding it up at the top is a brass window sash latch, which clamps down nicely and has a little leaf spring to keep it tight.
The next photo shows the table folded down. The two pieces of cherry that are vertical in this position are structural members which will each have a length of angle iron which will butt up against the back of the bulkhead it folds from. I'm hoping that this will provide sufficient support, but in the event that is doesn't I can add a short amsteel tether on each arm to go to a pad-eye through bolted to the structural bulkhead behind. I'm hoping to get the bolts for the angle iron soon so I can find out if this will be necessary.
First Roof Panel
Enough spars are on now to mount the first roof panel. I would have liked to just lay on a full 4x8 sheet, but the curvature was too much to take parallel to the grain so I split it and am laying it down crossgrain in four foot sections. The photo above is actually from the dry fit, it got some paint and insulation before the final fit. The photo on the left is after letting the glue set for most of the day and routing out the access hatch and vent.
Last Bulkhead and More Spars
Alright, with presidents day off I've got a three day weekend to work and I'm hoping to make good progress. First thing is to get the last bulkhead in so I can get the second portion of the ceiling in. The photo above shows the front portion and framing in, which is being painted along with the rear portion before adding insulation and sealing it up.
While that is drying, more spars are going in on the front portions, with the conduit for the lights and ventilation fan wiring down the centerline. The opening in the front bottom is for the access hatch to the tongue box. The block with the three vertical slots is a passive intake vent. It is closeable from the inside and opens into the tongue box to minimize any stray water getting in.
While that is drying, more spars are going in on the front portions, with the conduit for the lights and ventilation fan wiring down the centerline. The opening in the front bottom is for the access hatch to the tongue box. The block with the three vertical slots is a passive intake vent. It is closeable from the inside and opens into the tongue box to minimize any stray water getting in.
Thursday, February 6, 2014
Ceiling Part 1
With the bulkheads progressing nicely in the rear, I've started to work on getting the first panel of the ceiling in. It is 3mm baltic birch and has no trouble conforming to the 32" curvature of the front of the trailer. No doubt the 1/4" ACX for the roof will be a different story, but I'll deal with that when I get there. The 5'x5' panel was spiled and fitted without to much trouble and lay down nicely with little coercing. I've also started on getting the spars fitted to provide the ceiling with stiffness and anchor the exterior ply for the roof. The first spar is at floor level and, together with the second, outline the hatch opening. The third spar has a channel down it from the centerline to the right wall, to route some of the electronics to the control panel. I'm trying to alternate working on the ceiling and on the bulkheads with the end goal of having both finished at the same time for the roof to go on.