Alright, with presidents day off I've got a three day weekend to work and I'm hoping to make good progress. First thing is to get the last bulkhead in so I can get the second portion of the ceiling in. The photo above shows the front portion and framing in, which is being painted along with the rear portion before adding insulation and sealing it up.
While that is drying, more spars are going in on the front portions, with the conduit for the lights and ventilation fan wiring down the centerline. The opening in the front bottom is for the access hatch to the tongue box. The block with the three vertical slots is a passive intake vent. It is closeable from the inside and opens into the tongue box to minimize any stray water getting in.


No comments:
Post a Comment